Difference between revisions of "Ti (titanium)"
Jump to navigation
Jump to search
(8 intermediate revisions by the same user not shown) | |||
Line 7: | Line 7: | ||
===Deposition Equipment=== | ===Deposition Equipment=== | ||
* '''PVD-02:''' [[Lesker PVD75 E-Beam/Thermal Evaporator | Lesker PVD75 E-Beam/Thermal Evaporator]] | * '''PVD-02:''' [[Lesker PVD75 E-Beam/Thermal Evaporator | Lesker PVD75 E-Beam/Thermal Evaporator]] | ||
+ | * '''PVD-03:''' [[Lesker PVD75 DC/RF Sputterer | Lesker PVD75 DC/RF Sputterer]] | ||
* '''PVD-04:''' [[Lesker PVD75 E-beam Evaporator | Lesker PVD75 E-beam Evaporator]] | * '''PVD-04:''' [[Lesker PVD75 E-beam Evaporator | Lesker PVD75 E-beam Evaporator]] | ||
− | |||
* '''PVD-05:''' [[Denton Explorer14 Magnetron Sputterer | Denton Explorer14 Magnetron Sputterer]] | * '''PVD-05:''' [[Denton Explorer14 Magnetron Sputterer | Denton Explorer14 Magnetron Sputterer]] | ||
===Etching=== | ===Etching=== | ||
− | == | + | ==Applications== |
==Processes== | ==Processes== | ||
+ | |||
+ | Titanium is NOT allowed in the following tools: [[Oxford PlasmaLab 100 PECVD | CVD-01]], [[Cambridge Nanotech S200 ALD | ALD-01]], [[SPTS Si DRIE | DE-03]], [[Oxford Cobra ICP Etcher | DE-05]], | ||
===Sputter Deposition Rates=== | ===Sputter Deposition Rates=== | ||
Line 30: | Line 32: | ||
! Pressure || Power || Rate || Pressure || Power || Rate || Pressure || Power || Rate | ! Pressure || Power || Rate || Pressure || Power || Rate || Pressure || Power || Rate | ||
|- | |- | ||
− | | PVD-03 || 6 mTorr || 300 W || | + | | PVD-03 || 6 mTorr || 300 W || 3.7 Å s<sup>-1</sup> || 08/12/24 || 5 mTorr || 300 W || 0.98 Å s<sup>-1</sup> || 03/06/23 || 6 mTorr || 300 W || 0.8 Å s<sup>-1</sup> || |
|- | |- | ||
|} | |} | ||
Line 36: | Line 38: | ||
{| class="wikitable" | {| class="wikitable" | ||
! rowspan=2 | PVD Tool | ! rowspan=2 | PVD Tool | ||
− | ! colspan=3 | Cathode 2 (DC | + | ! colspan=3 | Cathode 2 (DC) |
! rowspan=2 | Recorded | ! rowspan=2 | Recorded | ||
|- | |- | ||
− | ! Pressure || Power || Rate || | + | ! Pressure || Power || Rate |
+ | |- | ||
+ | | PVD-05 || 3 mTorr || 350 W || 2.0 Å s<sup>-1</sup> | ||
+ | |- | ||
+ | |} | ||
+ | |||
+ | '''PVD-05 Master Recipe:''' | ||
+ | |||
+ | Step T004 is the deposition step and step T005 is the cool-down step (60 s). | ||
+ | |||
+ | {| class="wikitable" | ||
+ | ! Step Number || T000 || T001 || T002 || T003 || T004 || T005 || T006 | ||
+ | |- | ||
+ | |- | ||
+ | | Step Time (sec) || 5 || 120 || 60 || 60 || [dep] || 60 || 5 | ||
+ | |-style="background-color:#FFFFFF" | ||
+ | | Min Vacuum Setpoint (Torr) || || || || || || || | ||
+ | |- | ||
+ | | || || || || || || || | ||
+ | |-style="background-color:#DBFEFF" | ||
+ | | Gas - (PID or Fixed) || || PID || PID || PID || PID || || | ||
+ | |-style="background-color:#FFFFFF" | ||
+ | | Gas - PID Master Gas Select || || 1 || 1 || 1 || 1 || || | ||
|- | |- | ||
− | | | + | | Gas1 - Setpoint (sccm) || || 10 || 10 || 10 || 10 || || |
+ | |-style="background-color:#FFFFFF" | ||
+ | | Gas2 - Setpoint (sccm) || || || || || || || | ||
+ | |- | ||
+ | | || || || || || || || | ||
+ | |-style="background-color:#DEB4DC" | ||
+ | |Gas PID Pressure (mTorr) || || 10 || 5 || 3 || 3 || || | ||
+ | |-style="background-color:#DCF5E9" | ||
+ | | RF Source - Sputter (Watts) || || || || || || || | ||
+ | |-style="background-color:#DCF5E9" | ||
+ | | RF Source - Cathode Select || || || || || || || | ||
+ | |-style="background-color:#DCF5E9" | ||
+ | | RF Source - Shutter || || || || || || || | ||
+ | |-style="background-color:#ECFA6F" | ||
+ | | DC 1 Source - Sputter (Watts) || || 100 || 200 || 300 || 350 || || | ||
+ | |-style="background-color:#ECFA6F" | ||
+ | | DC 1 Source - Cathode Select || || 2 || 2 || 2 || 2 || || | ||
+ | |-style="background-color:#ECFA6F" | ||
+ | | DC 1 Source - Shutter || || || || || Open || || | ||
+ | |-style="background-color:#FAD86F" | ||
+ | | DC 2 Source - Sputter (Watts) || || || || || || || | ||
+ | |-style="background-color:#FAD86F" | ||
+ | | || || || || || || || | ||
+ | |-style="background-color:#FAD86F" | ||
+ | | DC 2 Source - Shutter || || || || || || || | ||
+ | |-style="background-color:#6FD2FA" | ||
+ | | Pressure Control (Throttle) || Yes || Yes || Yes || Yes || Yes || || | ||
+ | |-style="background-color:#FFFFFF" | ||
+ | | Ignition Pressure (mTorr) || || || || || || || | ||
+ | |- | ||
+ | | || || || || || || || | ||
+ | |-style="background-color:#E8F213" | ||
+ | | Rotation Speed (0-100%) || 50 || 50 || 50 || 50 || 50 || || | ||
|- | |- | ||
+ | | End Process (Yes) || || || || || || || Yes | ||
|} | |} |
Latest revision as of 12:53, 23 September 2024
Titanium is a transition metal with atomic number 22 and symbol Ti. Titanium has a low density, high strength and is resistant to corrosion by water. It has relatively poor electrical and thermal conduction compared to most metals.
Equipment
Deposition Equipment
- PVD-02: Lesker PVD75 E-Beam/Thermal Evaporator
- PVD-03: Lesker PVD75 DC/RF Sputterer
- PVD-04: Lesker PVD75 E-beam Evaporator
- PVD-05: Denton Explorer14 Magnetron Sputterer
Etching
Applications
Processes
Titanium is NOT allowed in the following tools: CVD-01, ALD-01, DE-03, DE-05,
Sputter Deposition Rates
PVD Tool | Cathode 2 (DC; high mag) | Recorded | Cathode 3 (DC) | Recorded | Cathode 4 (DC; high mag) | Recorded | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
Pressure | Power | Rate | Pressure | Power | Rate | Pressure | Power | Rate | ||||
PVD-03 | 6 mTorr | 300 W | 3.7 Å s-1 | 08/12/24 | 5 mTorr | 300 W | 0.98 Å s-1 | 03/06/23 | 6 mTorr | 300 W | 0.8 Å s-1 |
PVD Tool | Cathode 2 (DC) | Recorded | ||
---|---|---|---|---|
Pressure | Power | Rate | ||
PVD-05 | 3 mTorr | 350 W | 2.0 Å s-1 |
PVD-05 Master Recipe:
Step T004 is the deposition step and step T005 is the cool-down step (60 s).
Step Number | T000 | T001 | T002 | T003 | T004 | T005 | T006 |
---|---|---|---|---|---|---|---|
Step Time (sec) | 5 | 120 | 60 | 60 | [dep] | 60 | 5 |
Min Vacuum Setpoint (Torr) | |||||||
Gas - (PID or Fixed) | PID | PID | PID | PID | |||
Gas - PID Master Gas Select | 1 | 1 | 1 | 1 | |||
Gas1 - Setpoint (sccm) | 10 | 10 | 10 | 10 | |||
Gas2 - Setpoint (sccm) | |||||||
Gas PID Pressure (mTorr) | 10 | 5 | 3 | 3 | |||
RF Source - Sputter (Watts) | |||||||
RF Source - Cathode Select | |||||||
RF Source - Shutter | |||||||
DC 1 Source - Sputter (Watts) | 100 | 200 | 300 | 350 | |||
DC 1 Source - Cathode Select | 2 | 2 | 2 | 2 | |||
DC 1 Source - Shutter | Open | ||||||
DC 2 Source - Sputter (Watts) | |||||||
DC 2 Source - Shutter | |||||||
Pressure Control (Throttle) | Yes | Yes | Yes | Yes | Yes | ||
Ignition Pressure (mTorr) | |||||||
Rotation Speed (0-100%) | 50 | 50 | 50 | 50 | 50 | ||
End Process (Yes) | Yes |